The crew along with the help of several volunteers from Newberg Christian Church have been working towards putting up sheetrock on the walls in the western administration and reception areas. The Mezzanine level is being taped, mudded and sanded. The lower level has about two-thirds of the ceiling sheetrock installed. The pictures show some temporary lighting. Thank you to all who have taken some time to come over and help out.