The summer camping season is drawing to a close. The summer youth camps are concluded. We still have Family Bible Conference, Singles Retreat, Septemberfest, and Friends of Wi-Ne-Ma Day before we come to a pretty full fall for retreat groups.

We haven't had much of a chance to do a lot with the Missions Building. But, there has been a bit of progress. Good news is that the stairs have been put in on both ends of the mezzanine. And, they have passed inspection. Other pictures are of work in the west and south entry ways.

Next up in September is to get the septic tanks put in which will allow us to proceed with plumbing and bathrooms. We also need to have some electrical work done as well as the conferences being over before we can start on the west end offices and mezzanine.

We are looking forward to Friends of Wi-Ne-Ma Day as giving a good donation boost for us to be able to continue on this winter as we have time now to get working on these other areas.

The Missions Building was a wonderful asset to the various programs this summer and we got a taste of how much more it can do once it is completed.

Thanks for following along.