Framed

Work has been moving on the Missions Building project since the summer camping season concluded. Friends of Wi-Ne-Ma Day gave a big boost to the project as we started working in earnest on the remaining areas. The electrician has been in to run a number of the remaining circuits. The black paper has been installed over the mezzanine area allowing the rooms in the upstairs level to be framed in. The Fire Alarm plan is being reviewed and after the fire alarm system is installed we can start working on the downstairs and the bathrooms that will be part of the western end of the building.

Timely financial gifts and timely workers have made this possible as we look forward to having our offices and some restrooms in by the next camping season.

Framing in a storage and equipment room on the Mezzanine level.
Finally, through with the black paper covering the insulation. This has been one of the most tedious jobs in the process. But, it looks great once it is done!

Putting up the strandboard backing on the Mezzanine Level.



One of the upstairs rooms framed in.


Looking from the inside out.


A closer view of the black paper project and preparation for framing a room.