As we transitioned from May to June the pace at Camp has picked up quite a bit. There was the transition from hosting Outdoor Schools to hosting our summer camps. Christian Heritage Conference, Hispanic Family Camp and the first two youth camps have already moved through.
On the Missions Building, most of the effort in the last month has been on the sprinkler system and building the walls inside. We also have the conduit in the ground for the power company to eventually come and hook up the building. We have had a number of volunteers in doing some framing and sheeting the inside walls. The walls around the great room are what will be there according to the plans. Other walls are temporary to secure areas that won't be ready by Week of Missions.
In order to be as ready as we are going to be by Week of Missions, we need to have the sprinkler system and heating system installed and the electrical system installed for the Great Room. We are on schedule, but we also realize that we have just over a month to get that done. Thanks for your prayers and support.
Tuesday, June 23, 2009
Subscribe to:
Posts (Atom)